通用banner
Location : IndexNews center

Contact Us

Jiangsu Shilin Electrical Equipment Co., Ltd

Marketing department: Fang min

Phone:0511-88418040

Mobile:13852992453

Fax:0511-88416878

E-mail:SL9540@126.com

Website:www.cnshihlin.com

Address: No.28 Jiangcheng Road, science and Technology Park, Xinba Town, Yangzhong City, Jiangsu Province

Operation performance of pipe supports and hangers

Pipe supports and hangers will be used in any place where there is pipe laying, also known as pipe support, pipe section, etc. As the support structure of the pipeline, the pipe support is divided into fixed and movable according to the operation performance and layout requirements of the pipeline. The place where the fixed point is set is the fixed support, and the pipe support and the pipe support can not have relative displacement. The anti-seismic strengthening measures of pipe supports and hangers are the measures taken to strengthen the strength, improve the ductility, strengthen the integrity and improve the force transmission path to make the existing construction projects meet the specified seismic fortification requirements. When the overall performance of the masonry structure building can not meet the requirements, the external reinforced concrete structural column and ring beam can be used for reinforcement, and the external reinforced concrete constructional column, ring beam and tie rod instead of the inner wall ring beam can be used to divide and surround the wall section of the multi-storey masonry structure horizontally and vertically to form a constraint on the wall section, so as to strengthen the integrity of the building and improve the anti collapse ability.